<< Back to Project Gallery

Project Detail

Orrs Summer Landing

Clients with a 100-year-old house originally approached us about a kitchen/bath remodel, which eventually developed into a deep energy retrofit. The renovation included a new open plan on the main level with new kitchen. The second floor was reconfigured from a 4 bed/1 bath to a 3 bed/2 bath with a new master suite. Both Marvin and Integrity windows were used throughout.

Marvin Products Used:

Ultimate Double Hung Windows

Contact :


424 Fore St.
Portland, ME 04101

2078422888
http://www.kaplanthompson.com
jamie@kaplanthompson.com

Marvin Design Gallery
FEED

Need to unwind after a long Monday? A chair made completely of pillows: http://b...

Need to unwind after a long Monday? A chair made completely of pillows: http://bit.ly/1Bw3yda

...