<< Back to Project Gallery

Project Detail

Orrs Summer Landing

Clients with a 100-year-old house originally approached us about a kitchen/bath remodel, which eventually developed into a deep energy retrofit. The renovation included a new open plan on the main level with new kitchen. The second floor was reconfigured from a 4 bed/1 bath to a 3 bed/2 bath with a new master suite. Both Marvin and Integrity windows were used throughout.

Marvin Products Used:

Ultimate Double Hung Windows

Contact :


424 Fore St.
Portland, ME 04101

2078422888
http://www.kaplanthompson.com
jamie@kaplanthompson.com

Marvin Design Gallery
FEED

Winter is around the corner, be prepared! Signs that it's time for window replac...

Winter is around the corner, be prepared! Signs that it's time for window replacement: http://bit.ly/1u1313S

...